Bibliography |
: |
[1] Ahuja, N. Hira, Dozzi, S.P., Abourizk, S.M. 1994. Project Management: Techniques in Planning And Controlling Contruction Project, 2nd Edition, United State of America, John Wiley & Sons, Inc.
[2] Callahan, MT, Quackencush, DH, and Rowings, JE. 1992. Construction Project Scheduling, New York: McGraw-Hill.
[3] Erviato, I. Wulfram. 2007. Manajemen Proyek Konstruksi. Edisi III. Yogyakarta, Andi.
[4] Erviato, I. Wulfram. 2007. Teori – Aplikasi Manajemen Proyek Konstruksi. Edisi I. Yogyakarta, Andi.
[5] Girsang, S. David. 2009. Analisis FaktorFaktor Penyebab Keterlambatan Pelaksanaan Proyek-Proyek Pemerintah, Tesis, Depatemen Pekerjaan Umum - Universitas Katolik Parahyangan, Bandung.
[6] Husen, Abrar. 2006. Manajemen Proyek Konstruksi. Edisi I. Yogyakarta, Andi.
[7] Kerzner, Harold. 2006. Project Management: A Systems Approach To Planning, Scheduling, And Controling, 9th edition, United State of America, John Wiley & Sons, Inc.
[8] Praboyo, Budiman. 1991. Keterlambatan Waktu Pelaksanaan Proyek: Klasifikasi Dan Peringkat Dari PenyebabPenyebabnya, Jurnal, Dimensi Teknik Sipil, Volume 1.
[9] Riduwan. 2007. Metode dan Teknik Menyusun Tesis, Cetakan ke-5, Bandung, Alfabeta.
[10] Ruskanto. 2009. Kajian Faktor-Faktor Yang Mempengaruhi Waktu Pelaksanaan Proyek Jalan (Studi Pada Proyek Jalan Kabupaten Di Kabupaten Subang). Tesis, Departemen Pekerjaan Umum – Universitas Katolik Parahyangan, Bandung.
[11] Santoso, Indriani. 1999. Analisa Overruns Biaya Pada Beberapa Tipe Proyek Konstruksi, Jurnal, Dimensi Teknik Sipil, Volume 1.
[12] Wibowo, Andreas. 2008. Survei Persepsi Pengajuan Klaim Atas Keterlambatan 34 Jurnal Teknik, Volume 21, Nomor 2, Desember 2020 (27-34) Akibat Pihak Pemilik Pada Proyek Konstruksi Pemerintah, Jurnal.
|